The new production base was invested and established in 2018, during which construction was suspended due to the
epidemic, but it was finally officially put into production at the beginning of 2023. The new production base is
equipped with vertical multi-stage pump production workshop, water circulation pump production workshop and the
latest spiral cutting sewage pump production line. At the same time, it is equipped with the latest electrophoretic
spraying production line.
